> About > History >
About

Date

July, 2004 EAF dust annual treatment exceeds 60,000 tons (wet base)
December, 2003 EAF dust annual treatment exceeds 50,000 tons (wet base) reaching original design capacity
December, 2001 Obtain EAF dust industrial waste jointly pick-up and treatment permit from Minister of Economic
February, 2000 Obtain plant registration certificate from Minister of Economic
June, 1999 1st high temperature smelting Waelz kiln formally test-run operation start-up
December, 1996 Fly ash dust industrial waste generated from EAF steel mills jointly treatment facility is approved by Industrial Bureau Minster of Economic
August, 1996 Resolution passed by special shareholder meeting to merge Mid-North Environmental Engineering Co., Ltd. And southern area Siaogang Enterprise Co. Ltd. and changed name to Taiwan Steel Union, Co. Ltd.
May, 1995 Mid-North Environmental Engineering Co., Ltd. was formally established.

First  Last  Next  Finally  Select:   Page: 3 / 3

TOP